Production Planning Control (PPC)
Production Planning Control (PPC)1349
Applications
1349
Applications
Not Accepting Applications
About the Job
Skills
Collect the PF from the Design.
Entering details into register (order booked and committed date).F-CPS 01
Study & Review the PF.
a. Drawing / Inputs.
b. Specification.
c. Delivery time.
4. Plan for the material.
Raise the material requisition (MRN) for the fallowing
a. Bought out items.
b. Raw materials.
c. Give the cutting sizes through cutting book.
6. Production Planning, according to the availability of the shop floor load either In house / Out house depending on priority.
Enter the details into Weekly production plan (Component + Assembly).
Enter the details into Active Planning sheet based on the delivery schedule discussing
With
- a. Purchase In charge.
- b. Subcontractor In charge.
- c. Production In charge.
About the company
Industry
Hydraulics manufacturers ...
Company Size
51-200 Employees
Headquarter
Dabaspet
Other open jobs from Om Shakti hydraulics pvt Ltd